9/4/2023 0 Comments Poly bridge triple split![]() Some hydraulic cannon designs require 2 hydraulics, rendering them impossible in Challenge Mode, but there are still some that only require a single one to function. Turning off the grid may help extend the roads as close as possible to the terrain on the right side. With only 8 roads, the very end of your overpass will be cut off, meaning that the Vespa will have to make a small jump down to the land. In Challenge Mode, you now have to find a way to lift up both intersecting roads with only a single hydraulic. Challenge Mode Ĭhallenge Mode for this level limit your materials, which doesn't prevent any of the 3 solutions, but does make each one of them slightly more difficult. It is very hard to perfect, and even if you do get the buggy launch, oftentimes the vehicle will miss the flag. ![]() Nicknamed the " Hydraulic Cannon", by abusing a bug in the game's mechanics, players have found a way to use hydraulics to pull extremely precise roads inside of the Vespa, causing it to fly out up and to the right. You can use the tracer tool, found in the bottom right corner, to create a clean, symmetrical arch. ![]() You can make an overpass above the bridge to avoid hitting the Hydrofoil and getting the Vespa across safely. This is the more common method that players of Poly Bridge 2 use, but is still intended. If you want to understand how hydraulics work in full, pay attention to the drawbridge in the tutorial, and look closely at Tip 42 in Tips (F1). Use split joints to split the bridge in half safely, and then use Hydraulics to lift the roads out of the way so that the boat can pass through without damaging the bridge. There is also a glitchy way to complete the level, and although it's unintended behavior, it's necessary to get the absolute cheapest solution possible.īased on the name of the level, this is evidently the primary intended solution. There are two intended solutions for this level, and both may benefit from the two anchors underneath the waterline. It is a 16 meter bridge with two pillar supports at the bottom with anchors and a Hydrofoil boat that will attempt to pass through the bridge. Layout įirst Drawbridge is the sixth level in Pine Mountains.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |